Aceco, LLC - Phone: 301.588.0707HomeAbout UsProjectsTestimonialsContact Us

United States Capitol Visitors’ Center
Centex Construction Co.
Construction Mgr.: Gilbane Building Co.

Description: Construction of 600,000 square foot underground visitors’ center with tie-in to existing historic structure. Work includes major structural concrete demolition, excavation and architectural, mechanical, electrical and plumbing demolition. Project includes hazardous materials abatement. Security clearances and off hours work required.
ACECO's contract value: $2,000,000.00

 

Fed Ex Field Seating Expansion
Turner Construction Co.
Description: Extensive structural demolition required for installation of five thousand additional seats. Interior architectural demolition also involved. Fast track project completed within one-month schedule.
ACECO's contract value: $468,000.00

 

Pentagon Basement Renovation
The Clark Construction Group
Description: Interior structural demolition and hazardous material abatement in excess of 200,000 square feet. Work included extensive structural concrete sawing and removal, elevator demolition, MEP, and architectural demolition adjacent to occupied and classified areas inside Pentagon. Abatement process involved sandblasting of lead-based paint covered columns and asbestos removal throughout entirety of renovation area. Required to staff with four crews working two shifts.
ACECO's contract value: $3,120,000.00

 

The John A. Wilson Building
The Clark Construction Group
Description: Interior demolition and hazardous material abatement of historic structure in excess of 400,000 square feet. Work included extensive structural demolition, excavation of entire basement to provide lower slab elevation, removal of flooring, sub flooring, sleepers and concrete fill, multiple duct penetrations through masonry and concrete walls up to two feet thick, removal of all existing windows and removal of elevators.
ACECO's Contract Value: $1,700,000.00

 

Main Treasury Renovation
Turner-Grunley Joint Venture
Description: Complete renovation of historic landmark including structural, architectural, mechanical, electrical, plumbing, and elevator demolition in occupied building. Includes multi-phased work with multiple crews. Project requires on-site Quality Control Manager.
ACECO's contract value: $7,000,000.00

 

Omni Shoreham Renovation
The Clark Construction Group
Description: Multi-phase selective structural, interior, and MEP demolition of occupied hotel with more than of 600 rooms and including more than 200,000 square feet of public areas. Work included demolition, and excavation for site work including removal of pools and terraces. Asbestos abatement performed throughout hotel.
ACECO's Contract Value: $2,400,000.00

 

Kennedy Center Concert Hall Renovations
The Clark Construction Group
Description: Selective structural, interior, and MEP demolition including removal of cantilevered concrete balconies above finishes to remain. Saw cutting and salvage of stage flooring. Hazardous material abatement performed throughout work area. Special work hours were required to enable Kennedy Center to remain open and occupied. Double shifts maintained for duration of project.
ACECO's Contract Value: $600,000.00

 

Mazza Gallarie Renovation
James G. Davis Construction Corporation
Description: Structural demolition of more than 6,000,000 pounds of reinforced concrete structural slab, columns and beams from third floor roof of occupied shopping mall. Demolition of heating and cooling system, total interior architectural strip-out, removal of escalators, elevators and stairs. Removal of stone façade to include asbestos underlayment. Excavation and removal of 250 cubic yards of bedrock and contaminated soil from below parking garage slab during normal mall operations.
ACECO's Contract Value: $1,700,000.00

 

Representative List of Clients
Clark Construction, JBG Companies, Whiting-Turner Construction, James G. Davis Construction, Turner Construction, Architect of the Capitol, PN Hoffman, Donohoe Construction, Bovis Lend Lease, J.A. Jones/Tompkins, Roadside Development, Sigal Construction, Eichberg Construction, George Washington University, Howard University, Forrester Construction, Stanley Martin Companies, Foulger-Pratt Construction, Coakley-Williams Construction, Manhattan Construction, Realco, Corcoran Gallery of Art, Gibson Builders, JPI Builders, Paradigm Construction, Monarc Construction, City of Rockville, City of Gaithersburg, Lloyd Moore and Associates, L.F. Jennings Construction, Glen Construction, Tucon Construction, Academy of the Holy Cross, DPR Construction, Hitt Construction, Reiss Construction, McCullough Construction, Kfoury Construction, Grunley Construction, Poole & Kent Contractors

 

Other Notable Projects
Holy Cross Hospital Expansion, Pentagon Wedge One Renovations, National Archives Building Renovation, Utilities Upgrade @ Department of Treasury, United States Capitol Building Asbestos Abatement at Mechanical Rooms, Old Woodies’ Building Renovation, Willard Hotel Renovation, Mayflower Hotel Renovation, John A. Wilson Building Renovation, Bowie Race Track Demolition, Prince George’s County Courthouse Fire Clean-up, Dominion Semi-Conductor Plant

________________________________________________________________________________________________________________________________________

ACECO, LLC

 

901 Stoddard Place
Silver Spring, MD 20910
Phone: 301.588.0707
Fax: 301.588.2542
E-mail:
info@acecoworld.com

________________________________________________________________________________________________________________________________________

Additional Projects

Debris removal services

National Archives
Interior Demolition. Lead paint removal. Asbestos abatement. Excavation. Complex work inside of occupied, historic government building.

 

Department of Treasury
Interior Demolition. Sequenced work in occupied, historic structure. Security clearances required.